Construction Up-Date 2

The father of one of our workers passed away in the beginning of February. Since all our workers belong to the same community, they all left the construction site, in order to help with the funeral. We had no choice but to leave the building site idle for an entire week.The work has now resumed and we are about to put on the roof.


We are planning to organize an opening ceremony on March 23rd, 2009 with GRAPHIS and SIDE-BY-SIDE INTERNATIONAL, the main donors of the health center. We have only one month left…..




2/12/09

The Road Branch to the Health Center is opened!

At the end of January 2009, the repair works on the road branching out from Road No. 4 to the Graphis Health Center were completed. It was a very rough rock littered dirt road overgrown with grass, which made access to the Health Center difficult and dangerous.

Thanks to the support from the local authorities and from the main donor, GRAPHIS, a Japanese students group, we could manage to repair this road section in three weeks!

The local authorities contributed heavy machinery and workforce for 3 weeks. GRAPHIS provided the funds needed to cover all the costs, including fuel, food for the works and other costs.

It now takes just 5 minutes to access the health center from National Road No. 4, instead of half an hour.



There is still more work to do in order to keep the road smooth throughout the year. As it is not paved, we are planning to cover it with tiny red stones that will act as gravel to prevent it from becoming slippery when wet.



We dug a ditch on both sides of the road. During the rainy season, the ditch will work as drainage. In the dry season, we will fill the ditches with water, to be used by the villagers.
We also plan to raise fish in the ditches. It will be a valuable source of proteins for the people of this area who rarely have opportunity to obtain it.
The ditches will be connected, to keep water moving and prevent it from becoming a breeding ground for malaria-spreading mosquitoes.